E-mail: info@wutama.tech 

Location: 8-125 Karolinskaya Street, 220087, Minsk, BELARUS

Our Projecs

Within the project on launching a production line at the Customer’s request, the following steps were implemented:

- comparative analysis of production technologies in accordance with the Customer's business idea;

- development of a comprehensive business plan;

- selection of necessary equipment and technologies using an on-site inspection of manufacturing plants;

- selection and technical audit of production facilities for equipment placement;

- audit of equipment condition and completeness of technical documents when shipped from manufacturing plants;

- development of technical specifications for environmental design.

A series of technical consultations is currectly implemented to organize interaction between the Client and contractors for construction and repair works, installation and starting-up of the equipment.

 
 
 
 
 

As part of the server hardware production launch project, the following was completed: - a review of technological capabilities, economic preferences, and operational features within the industrial park; - an analysis of the server and IT equipment market for the Client's subsequent assessment of the project's feasibility; - an analysis of production technologies and a comparison of approaches to the depth of processing, from assembly to full-cycle production; - technical requirements for the selection of a production facility were developed. The project is currently in the business planning stage.
 
 

PROJECT GOAL:

Comprehensive modernization of rice production, increasing production capacity while reducing energy consumption, automating technological processes to expand product range, improve quality, and increase finished product yield.

THE PROJECT INCLUDES:

- Analysis and selection of production technologies and energy efficiency technologies in accordance with the Client's business concept;

- Analysis and selection of equipment with on-site inspection of manufacturing plants;

- Business plan development;

- Technical audit of the production facility in accordance with the Client's new technological needs;

- Representation of the Client's interests in communications with design, construction, and engineering companies;

- Development of technical specifications for environmental design;

- Development of a waste management and handling system.

PROJECT GOAL:

Creating a high-tech warehouse logistics ecosystem that ensures maximum inventory accuracy through the implementation of intelligent management systems.

THE PROJECT INCLUDES:

- Analysis and selection of technologies for organizing warehouse operations based on the "Smart Warehouse" concept;

- Analysis and selection of equipment with on-site inspections of manufacturing plants;

- Development of technical specifications for the purchase of equipment and automation systems;

- Representation of the client's interests in communications with design, construction, and engineering companies.